Monday, April 20, 2009

Usually I hate Mondays... planning the week out, getting parts ordered, calling customers and distributers back. But at least we got our new uniforms today. Something about your name on a shirt that makes a guy feel professional...

On Davin's Tacoma SAS Project, we're on track for mounting the ifs steering box tomorrow. I finished smoothing down the frame on the passenger side and welding in the frame stiffener. Ted's hacking away at the driver's side frame rail right now. After we pull the radiator and weld the crossmember and hangers, should be no time before we hang the springs and axle. The stuff from Ruff Stuff better show up soon. Ted got the D44 assembled hub to hub, minus the steering.

On Al's 3 Link CJ buggy, Chris got all the links and trackbar mocked up, as well as mounted the link bracketry. We flexed it out and have the coilover hoops bent up. Tomorrow we'll get those hung, fully weld and paint everything. Should have it all reassembled so we can start on remounting the rear coil overs and finishing up some tube work.